Refurb
Refurbishment in Aberdeen
Location
Aberdeen
Client
Repeat Client
Completion
February 2026
Unique Feature
Refurb

The Challenge
This refurbishment required a comprehensive internal refurbishment to bring its working environment up to a modern, functional standard. Operating within an active public sector facility presented unique challenges - works needed to be delivered to a high specification with minimal disruption, in a secure environment with strict access protocols.
The scope required MFG Construction to manage multiple workstreams simultaneously, coordinating trades across the building to deliver a complete transformation on programme and to budget.
Utilising our Scotland office, we deployed a mixture of MFG Construction staff from our Edinburgh base and a local supply chain.
Our Solution
MFG Construction mobilised a skilled, multi-disciplined team to carry out the full scope of works which is shown in our Project Highlights > > >
Project Overview
Refurbishment in Aberdeen






Project Highlights
Creation of a new dedicated Comms Room
Carpet tile installation throughout and safety flooring installation in designated areas
Full door access control, CCTV and intruder alarm installation
Replacement of suspended ceilings and upgrade of all lighting to LED throughout the building
Installation of new air conditioning units
Full internal decoration works
Working within a live and secure environment is not new territory for MFG Construction - it is exactly the kind of setting where our experience and professionalism set us apart. Our team understands that in environments like this, there is no margin for error. Access is controlled, security protocols are non-negotiable, and the building must remain fully operational throughout.
From day one, our operatives worked within the strict site-specific requirements of the facility - undergoing the necessary vetting procedures, respecting restricted areas and maintaining a disciplined, professional presence at all times.
Coordination with the client and site management was proactive and consistent, ensuring that every workstream was sequenced in a way that caused zero disruption to the day-to- day running of the station. We even sent our Project Director, Stephen Price, to personally oversee the job at various points in the programme.
This is something MFG Construction takes genuine pride in. It takes a particular kind of team to deliver high-quality refurbishment works in a sensitive, secure environment and ours did exactly that.
The Results
All works on this job have been completed to a high standard and keys have been formally handed back to the client. The project was delivered safely, on programme, and to the satisfaction of our client, reinforcing MFG Construction's reputation as a trusted delivery partner within the public sector.
The building has been fully transformed. It’s gone up several levels: upgraded infrastructure and improved security systems to a fresh, bright interior that creates a better working environment for the people who rely on it every day.
The MFG Construction Effect
This project demonstrates MFG Construction's ability to deliver complex, multi-trade refurbishment programmes within sensitive and secure environments.
Key strengths demonstrated on this project include:
• Multi-Trade Delivery: Coordinating M&E, fit-out, security systems and decoration under a single, managed contract
• Secure Environment Experience: Working safely and professionally within an operational, access-controlled facility• Programme Management: Delivering all workstreams on time and to the required standard
• Quality of Finish: A complete transformation that reflects the care and expertise of our workforce
What we said:
"Projects like this are the ones that really demonstrate the capability of this team. Delivering a full multi-trade refurbishment package within a fully operational, secure publicsector facility is no small feat, but our team took it in their stride. The protocols, the access requirements, the standard of finish - everything was handled with real professionalism. We're delighted with the outcome and it's a project we're genuinely proud to have on our portfolio."
Stephen Price, Projects Director, MFG Construction















View more our latest projects
Ready to get started?
Let’s talk about your project—and how we can help bring it to life.

Ready to get started?
Let’s talk about your project—and how we can help bring it to life.

Ready to get started?
Let’s talk about your project—and how we can help bring it to life.